> smcta.com > Projects > Current Projects

Current Projects


View TA Construction Projects (Current) in a larger map
TA funds have been allocated to the following:
San Bruno Grade Separation

This $147 million project will elevate the Caltrain tracks above three existing at-grade street crossings in San Bruno.

Route 1 Calera Parkway

The purpose of the proposed project is to reduce congestion on a segment of Route 1 in Pacifica.

Route 101 and Broadway

The proposed project would remove the existing four-lane Broadway overpass and construct a new seven-lane overpass.