






Home

Site Map

Contact
|
|
City of Menlo Park |
|
|
The following is a list of city of
Menlo Park projects
(completed and in progress) funded by the current Measure A:
Completed Projects:
- Middle Avenue Corridor Study - design and implementation of
traffic calming alternatives and pedestrian/bicycle safety enhancements.
- Oak Knoll School Traffic Safety and Management Plan - design
and implementation of a comprehensive Safe Route to School Plan for Oak Knoll
School.
- Middle Cambridge RxR Bike Undercrossing - preliminary design
for a new bike undercrossing and path under the railroad tracks in the vicinity of
Burgess Park, connecting Alma Street to El Camino Real.
- Citywide Traffic Signal Bicycle Detection Upgrade - upgrade to
the traffic signals throughout the City to provide detection for bicycles.
- Santa Cruz Corridor Study - preliminary engineering design to
enhance safety for pedestrians and bicyclists.
- Woodland Avenue Traffic Management Plan - design and
implementation of traffic calming measures in this residential neighborhood.
- Willow Place Bicycle Bridge - design and replacement of a
deteriorated wooden bridge with a pre-fabricated steel bridge.
Projects in Progress:
- Shuttle Mitigation Fee - development of mitigation fee for
shuttle transportation in order to support the operation of existing and future
shuttle services.
- Shuttle Study Implementation - expansion of existing shuttle
services, addition of new services, analysis of various survey results and
collaboration with neighboring agencies.
- Menlo Avenue/University Drive Intersection Improvements -
design and implementation of intersection modifications to improve safety.
- Railroad Grade Separation - update existing study to determine
impacts and cost of building grade separations at Ravenswood, Oak Grove, Glenwood
and Encinal.
- Sand Hill Road Safety Study - design and implementation of
bicycle safety improvements such as enhanced bike lanes, dynamic speed display signs
and reduction in speed limits.
- Comprehensive Bicycle Plan - establishment of a comprehensive
bicycle development plan to provide vision, strategies and action elements for
improvement of bicycle traffic in Menlo Park.
- Willow Road Pre-emption System - design and implement a system
to accommodate emergency vehicles along this corridor.
- Bay Trail Feasibility Study - identify a feasible alignment for
a new trail segment that will connect existing Bay Trail in the Ravenswood Open
Space Preserve to Bay Trail along Bayfront Expressway, near Dumbarton Bridge.
- Neighborhood Traffic Management Program - creation of a formal
process to be used citywide to verify neighborhood level traffic calming needs,
coordinate the plan with affected residents, and establish a set of acceptable
improvement measures.
- Citywide Street Resurfacing Program - resurfacing of City
streets in need of repair.
|
|
|
|
|

|