This project is for the preparation of the project report
(PR) and the environmental documents. The reports are for the addition of
2 lanes, 1 in each direction of travel, plus a median divider and shoulder
improvements between Westport Drive and Fassler Avenue on Route 1. The
project scope is anticipated to include detailed design and construction at a
later date as the Board authorizes future budget.
The consultant is working on the environmental documents,
PR, and the preliminary design for the submittal to Caltrans.
The City of Pacifica is the lead in this project.
Funding for the project needs to be identified in the project report.
Future activities include submitting the draft project
report and draft environmental document to Caltrans for their review and comment
and continuing with the design of the project.
|