SamTrans Logo art
 

Fassler Ave. to Westport Dr.


This project is for the preparation of the project report (PR) and the environmental documents.  The reports are for the addition of 2 lanes, 1 in each direction of travel, plus a median divider and shoulder improvements between Westport Drive and Fassler Avenue on Route 1.  The project scope is anticipated to include detailed design and construction at a later date as the Board authorizes future budget.

The consultant is working on the environmental documents, PR, and the preliminary design for the submittal to Caltrans.

The City of Pacifica is the lead in this project.  Funding for the project needs to be identified in the project report.

Future activities include submitting the draft project report and draft environmental document to Caltrans for their review and comment and continuing with the design of the project.



 

Quick Hits

Progress Reports

Expenditure Plan
2009-2033


Dumbarton Rail

Highway 101 Auxiliary Lane Project:
Millbrae Avenue to Third Lane


Application for CAC Member
(PDF, 28 KB) - (MS WORD, 110 KB)

Procurement

Jobs