Sierra Point to San Bruno


This project is for the initial efforts of preliminary design for the auxiliary lanes between San Bruno and Sierra Point.  The project scope is anticipated to include detailed design and construction at a later date as the Board authorizes future budget.

A project study report was approved in 1993 and a segment of these auxiliary lanes were constructed as part of the Oyster Point interchange project phase 1 completed in in 1996.

This project is on hold due to its low priority.

When the project is likely to be included in the future STIP cycle, the PSR will be updated.



 