This project is for the preparation of the project study report (PSR), project report (PR) and the environmental documents for the construction of the Peninsula Avenue overcrossing to accommodate the Route 101 Auxiliary Lanes.  The project scope is anticipated to include detailed design and construction at a later date as the Board authorizes future budget.  Tied to project 725.

The Historic Properties Survey Report, the Historic Architectural Survey Report, the Archaeological Survey Report, the Natural Environment Study and Biological Assessment were submitted to Caltrans.  The work continues on the second draft of the environmental document.  The Consultant, Rajappan and Meyer, has started the preparation of the preliminary PS&E.

The environmental report has taken longer than anticipated.

The consultant, Rajappan and Meyer, will continue preparation of the PR and begin preparations for public review of the environmental document.  Work will continue on the PS&E. 



 

Quick Hits

Progress Reports

Expenditure Plan
2009-2033


Dumbarton Rail

Highway 101 Auxiliary Lane Project:
Millbrae Avenue to Third Lane


Application for CAC Member
(PDF, 28 KB) - (MS WORD, 110 KB)

Procurement

Jobs