This project is for the preparation of the project study
report (PSR) and the environmental documents for the additional auxiliary lanes
from Route 101 to Route 280, in the uphill (westbound) direction. The
project scope is anticipated to include detailed design and construction at a
later date as the Board authorizes future budget. The consultant,
Parsons Brinckerhoff, will write a project study report to evaluate all
alternatives, which will include all interchanges and evaluate the entire
corridor for auxiliary lanes. The consultant,
Parsons Brinckerhoff, has completed the project study report and design
exception fact sheets. The document was signed and approved by Caltrans on
July 9, 2001. Long range planning concepts are under
review. Future activities include continuing
meetings with citizens advisory board.
|