SamTrans Logo art
 

25th Avenue, San Mateo


This project is for the preliminary study of the 25th avenue grade separation project.  This project will segregate vehicular traffic from the existing railroad tracks by creating a railroad bridge structure to accommodate traffic underneath.  The project scope is anticipated to include detailed design and construction of a grade separation at 25th Avenue at a later date as the Board authorizes future budget.

Parson Brickerhohh has completed the study report for the City of San Mateo.

The City of San Mateo will need to finalize the overall planned development of this area before the project can go forward.

Future Activities include the City of San Mateo finalizing the overall planned development if this area. 



 

Quick Hits

TA Shuttle Inventory and Analysis (PDF, 1.71 MB)


State Route 1/Calera Parkway Project


Call for Projects:
Local Shuttle Program

Progress Reports

Expenditure Plans
1988-2008, Part One
1988-2008, Part Two
2009-2033

Strategic Plan 2009-2013
(PDF, 4.07 MB)

Quarterly Capital Projects Status Report

Highway 101 Auxiliary Lane Project:
Millbrae Avenue to Third Avenue


Application for CAC Member
(PDF, 28 KB) - (MS WORD, 110 KB)

Procurement

Jobs