This project is for the preliminary study of the 25th avenue
grade separation project. This project will segregate vehicular traffic
from the existing railroad tracks by creating a railroad bridge structure to
accommodate traffic underneath. The project scope is anticipated to
include detailed design and construction of a grade separation at 25th Avenue at
a later date as the Board authorizes future budget.
Parson Brickerhohh has completed the study report for the
City of San Mateo.
The City of San Mateo will need to finalize the overall
planned development of this area before the project can go forward.
Future Activities include the City of San Mateo finalizing
the overall planned development if this area.
|