SamTrans Logo art
 

Holly, San Carlos


This project is for the grade separation of Holly Street in San Carlos from the existing railroad tracks by creating a railroad bridge structure that accommodates traffic underneath.  The project is being implemented in 2 phases as follows:

PHASE A involves the installation of a temporary track known as a "shoofly", and the cut-over of the trains from the existing tracks to the shoofly.

PHASE B includes lowering Holly Street, constructing elevated track and structures, building railroad aerial platforms, upgrading the San Carlos station, lowering Brittan Avenue and Howard Avenue at permanent grade, switching over railroad operation to the new bridge and demolition of the shoofly.

Holly Street will be closed to traffic at certain stages of the construction, in which alternate routes will be in place.

This project is complete.

The SMCTA expended-to-date amount is underrunning the current SMCTA budget amount.  This underrun is part of the funding agreement which allows for the Ralston (Job No. 677), Harbor (Job No. 683) and Holly (Job No. 681) projects to continue payments up to a combined total of $60,166,000.

Future activities include the project close out. 



 

Quick Hits

Dumbarton Rail Project

TA Shuttle Inventory and Analysis (PDF, 1.71 MB)


State Route 1/Calera Parkway Project


Call for Projects:
Local Shuttle Program
Pedestrian and Bicycle Program

Progress Reports

Expenditure Plans
1988-2008, Part One
1988-2008, Part Two
2009-2033

Strategic Plan 2009-2013
(PDF, 4.07 MB)

Quarterly Capital Projects Status Report

Semi-Annual Measure A Program Status Report

Highway 101 Auxiliary Lane Project:
Millbrae Avenue to Third Avenue


Application for CAC Member
(PDF, 28 KB) - (MS WORD, 110 KB)

Procurement

Jobs