This project is to perform the preliminary engineering
studies and cost estimates for a combined grade separation station and
relocation project of the San Bruno station.
The preliminary engineering studies have been performed to
develop several different alternatives, to grade separate San Bruno, San Mateo
and Angus avenues and in conjunction with the grade separation work relocate the
Sylvan avenue station to a more favorable location. Meetings have been
held with city representatives and a presentation discussing the alternatives
was made to the public.
We are awaiting the award of a JPB specialty engineering
contract to continue preliminary engineering and cost estimates.
Future activities include performing additional
engineering and cost estimates on the various alternatives.
|