San Bruno Station Feasibility Study


This project is to perform the preliminary engineering studies and cost estimates for a combined grade separation station and relocation project of the San Bruno station.

The preliminary engineering studies have been performed to develop several different alternatives, to grade separate San Bruno, San Mateo and Angus avenues and in conjunction with the grade separation work relocate the Sylvan avenue station to a more favorable location.  Meetings have been held with city representatives and a presentation discussing the alternatives was made to the public.

We are awaiting the award of a JPB specialty engineering contract to continue preliminary engineering and cost estimates.

Future activities include performing additional engineering and cost estimates on the various alternatives. 



 

Quick Hits

Dumbarton Rail Project

TA Shuttle Inventory and Analysis (PDF, 1.71 MB)


State Route 1/Calera Parkway Project


Call for Projects:
Local Shuttle Program
Pedestrian and Bicycle Program

Progress Reports

Expenditure Plans
1988-2008, Part One
1988-2008, Part Two
2009-2033

Strategic Plan 2009-2013
(PDF, 4.07 MB)

Quarterly Capital Projects Status Report

Semi-Annual Measure A Program Status Report

Highway 101 Auxiliary Lane Project:
Millbrae Avenue to Third Avenue


Application for CAC Member
(PDF, 28 KB) - (MS WORD, 110 KB)

Procurement

Jobs