Town of Woodside |
|
|
Since the inception of Measure A, the town of
Woodside has benefited by the addition of
about $2.6 million in dedicated road improvement funds. They have converted these
funds into pavement and each year have undertaken a major town-wide pavement dig-out
and replacement project and a pavement overlay project.
1985-95
- Town-wide Pavement Rehabilitation (various locations)
1993-94
- A/C Overlay: Woodside Drive, Old La Honda Road, Jefferson Avenue
- Town-wide Dig-outs (various locations)
1994-95
- Slide Repair - Hillside Drive
- Town-wide Pavement Rehabilitation (various locations)
1995-96
- A/C Overlay: Portola Road, Canada Road
- Slide Repair: Kings Mountain Road
1996-97
- Town-wide Crack Seal Project
- Slide Repair - Kings Mountain Road
1997-98
- Road Rehabilitation: Kings Mountain Road
- Town-wide Crack Seal Project
1998-99
- Town-wide Crack Seal Project
- Town-wide Pavement Rehabilitation (various locations)
1999-00
- Town-wide Crack Seal Project
- Town-wide Pavement Rehabilitation (various locations)
2000-01
- A/C Overlay: Whiskey Hill Road, Portola Road, Old La Honda Road
- Town-wide Crack Seal Project
2001-02
- Town-wide Crack Seal Project
- A/C Overlay: Farm Hill Blvd., Canada Road
2002-03
- Town-wide Crack Seal Project
- Town-wide Pavement Rehabilitation (various locations)
2003-04
- Town-wide Crack Seal Project
|
|
|
|
|

|